09-21-2009 Paint mixer 2 control board

09-22-2009 Paint mixer 2
Started on the turntable!!!

;
09-23-2009 Paint mixer 2
Should have this knocked out by tomorrow the I can start mounting it on the machine. Sliced my left thumb open makes typeing on phone even slower.

09-24-2009 Paint mixer 2
Thanks for the server help they got what they needed. Got all the cylinders mounted getting so close to
fitting this in place. The sliders worked better then planned no need for arc or rollers just a lip.

09-25-2009 Paint mixer 2
The unit is complete and in position. It weighs in at 23.8lbs dry… Kind of hefty. I am going to order in some block and rails for stabilty. I’ll get them ordered this weekend and will probably be in by the time I am done wiring. Haven’t read the article about the art people yet but def will. Those are good relationships to nurture.
I brought home the rest of electronics today and am going to start on them this weeked.
Have a good one.
The Nelson had a Carivagio and a Le Tour in the permanent collection stashed a way in a smaller gallery kind off a stairwell near a side fire exit. They are worth a pit stop.

09-28-2009 Paint mixer 2
Got the control board cabinet built not really a cabinet but a two tierset up. Power supply is on the bottom relays and io boards on top. Tommorow finish sorting out wires and test mount cylinders.

09-29-2009 Paint mixer 2
Everything is mounted and I’ve started wiring. This pic is from lunch. Should be done wiring the contoller tomorrow then on to mounting the cylinders.

09-30-2009 Paint mixer 2
Will have this in place my noon.
I
am going to call you in the am I got contacted today by Gallery 9 the proposed a feature show in January.
I told them I would need
to talk to you first.

10-01-2009 Paint mixer 2
Just got home had to hang a show for Kate at a new downtown coffee house. Giant paintings in high winds creates lots of lift makes me want to Kite board.
I have not heard from Bob from the gallery I will stop in there tomorrow pm during their opening and meet him face to face and float option 3.
Just have a wee bit of wiring left on the board. Will finish that up. And get the turret mounted.
I ve got thoughts on.
The drawbot but am to beat to try and share them in any meaningful way.
Later
D
Ps I am so ready to get out of
the triple a leagues

10-02-2009 Paint mixer 2 s

10-02-2009 Paint mixer 2
Phase one of witing done. I sent you a PDF with the new INS and outs.
Monday mount turret, the controller is mounted.

10-05-2009 Paint mixer 2
Got all the needed wiring unraveled from the tangle. Also have the old paint air separated out. Got drawer glides mounted to a platform. Need to attach to the turret. I have feeling that this is going toneed a third point of support on the top to eliminate movement. I am going to pin it down and jog it round the table to see howstable it is.
Those vids were from the Basel in 08 I liked the big pooping blob machine:-)

10-06-2009 Paint mixer 2
Just need to finish mounting the motor then I can stick the turret back on the base. If it rides well during testing I’ll start wiring. If not I’ll stablize it.
That motor has an encoder I’ll wire that up. Will good be a good experience for future projects.

10-07-2009 Paint mixer 2
Tested moving it around it is wobbley enough to merit adding a top brace. I’ve got some linear glides out of some old scanners I tore apart that should do trick.

10-08-2009 Paint mixer 2
Got the guide support join with the glide, got the longer shaft installed on the turret. Just need to mount the turret to it’s base plate and feet it repositioned on the machine then install the top on the glide head. Should be wiring by lunch.